Secure Funding: Protect Your Critical Infrastructure
Posted: November 20, 2017
This grant closed on Nov 30, 2017. We have found similar active grants for you below.
Summary
This grant is for businesses within the Penn-Moynihan Complex that need to safeguard vital life safety and electrical equipment from weather-related damage. Funds will be used for crucial upgrades like waterproofing, drainage improvements, and structural reinforcement to ensure long-term protection of your facilities.
Eligibility
Full Description
The Project will protect critical life safety and electrical equipment in the Penn-Moynihan Complex from catastrophic damage during heavy rains and from long-term damage during smaller, more frequent rain events. The Penn-Moynihan complex consists of the NEC section between the Hudson River Tunnel portals and the East River Tunnel Portals in Manhattan, existing PSNY and its associated tunnels, storage yards and support facilities, and the future Moynihan Station, to be housed in the Farley Building. The Project will protect existing and planned critical facility electrical and life-safety equipment by reconstructing the entire north and south moats, install a waterproofing membrane, upgrade the drainage system, rehabilitate deteriorated steel, and reinforce and waterproof the existing concrete moat slab and sidewalk to protect existing and planned infrastructure investments for the long-term.